Part Number: DD101 LONG LEAD | Manufacturer: Crl Components Inc | NSN: 5910-00-678-8157 |
Item Name : Capacitor Fixed Cer | CAGE Code: 71590 | FSC CODE: 5910 Capacitors |
Alternate P/N : DD101LONGLEAD |
We are pleased to inform you that Part Number DD101 LONG LEAD Capacitor Fixed Cer. of manufacturer Crl Components Inc associated with NSN 5910006788157 is in stock. You can request a quote for this part DD101 LONG LEAD by filling out the form provided below. Once the request is received, one of our representatives will get back to you within 15 minutes.
Download the ASAP Semiconductor app on Google Play or the Apple App Store
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitorfixedceramic Dielectr | 5910 | 006788157 | 0 | P | 5910007524896 | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
La10t1s3 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | WO MTG FACILITIES RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1 500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0 290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0 156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0 250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0 025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODES |
AGAV | END ITEM IDENTIFICATION | MISSILE AI-TO-AIR PHOEBNIX AIM-54 TELETYPE MODEL 28 TEST CONSOLES MINI-SACE ENGINE AIRCRAFT TF33-PW-102 C-135E EC-135HKP MISSILE AIR-TO-AIR SPARROW AIM-7 SUPPORT EQUIPMENT MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100 000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56 022 0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55 0 DEG CELSIUS MINIMUM AND 85 0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000 0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10 0010 00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000 0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
At Complete Sourcing Solutions, You Can Get Quote for Your Required Part Number Within 15 Minutes. Just Fill Out the Instant RFQ Form.
Request for Quote